01 / 03
Release & Schedule Standard · Parks Dept Proposal
PAWNEE
One signal for what's open — park and pit alike.
ROOTED IN MAIN STREET · FULL-APPLY PERMITS · ALWAYS BROADCASTING CURRENT
by Leslie Knope
the map, before anything opens
02 / 03
STEP 2 · OPEN
It promotes toward
the park — unchanged.
v2.4.0 moves through every checkpoint its department defines, the same candidate each time. What's different is the venue: permits, crowd size, weather — set per park, not per candidate (and nobody gets a waffle without a form).
Opening is the mechanical action: placing a swing set into a park. When that reaches the citizens — staged through a soft launch, once the pit is filled — it is a grand opening. Same event, named from the citizens' side.
v2.4.0
MAIN
DRAFT
REVIEW
PARK
Venues are per-park flexible — a park declares the stops on its own line. No fixed ladder is enforced city-wide.
03 / 03
“The map should show
where you are — not just where you started.”
Pawnee doesn't describe a town. It broadcasts one — loudly, at every town hall, whether or not anyone asked.